A REVIEW ON LOW COST HOUSING CONSTRUCTION WITH DELAY MANAGEMENT

Authors

  • Deepak Tiwari Assistant Professor

Keywords:

Low cost housing construction, Delay management, Delay analysis

Abstract

Low price housing construction technologies aim to cut down construction price by victimization alternatives to plain ways and Input. “It is effective budgeting and technique that facilitate in reducing price of construction through use regionally gettable material in conjunction with improve skills and technology whereas not sacrificing the strength, performance and lifetime of structure. ’’Low price housing merely satisfies the foremost bottom and basic human wishes for shelter and neglects completely different wishes that people aim home furthermore as psychological, social, and aesthetic wishes and ultimately, would like for self-actualization. By victimization Low price Housing Technologies we are going to reduce approx. twenty fifth of the whole value of housing. the matter of delays in trade could also be a world development and there is no exception. the most purpose of this study is to identify the delay factors and additionally the result on the project completion by doing a case study in ongoing comes. By analyzing the reasons for delay, potential recommendations area unit given. the main factors celebrated throughout this case study area unit delays due to contractor, client and jointly due to nature’s act like rain. the foremost vital causes were delays in contractor's payments, shortage of fabric in construction, modification in material, the atmospheric phenomenon, shortage of work force (skilled, semi-skilled and unskilled labor ), frequent modification of staffs, poor computing machine management and improper management of the engineers. a number of the delays area unit delay in submission of drawings, house constraints, and delay in payment by client, delay in material supply and native problems like strikes. the main effects of delay area unit price impact, reduced labour productivity, postponement in work, modification in labour allocation etc. Not all delays could also be corrected; but few of them could also be overcome by up management responsibilities.

Additional Files

Published

2018-12-30

How to Cite

Tiwari, D. (2018). A REVIEW ON LOW COST HOUSING CONSTRUCTION WITH DELAY MANAGEMENT. NOLEGEIN- Journal of Business Risk Management, 1(2), 1–4. Retrieved from https://mbajournals.in/index.php/JoDBCM/article/view/299